>

Our sister companies

Search
Close this search box.

Melun Hospital, Melun, France

Melun Hospital specifies KPS piping to fuel diesel heating system

Project Overview

Melun Hospital specified KPS piping to provide a reliable fuel piping system for their diesel-powered central heating system. The designated installer of the project, “AXIMA” is a KPS certified installer and has years of experience working with KPS piping.

Key Requirements

  • A reliable HDPE double-wall piping system to supply diesel to the central heating system.
  • Minimal installation time.
  • Earthing to prevent static buildup.
  • A reliable installer with extensive experience installing the specified piping system.
KPS’ compact electrofusion fittings weld both piping walls simultaneously

The KPS solution

  • KPS 2″ (75/63) and KPS 4″ (125/110) piping proved an ideal long-term solution.
  • 60m coils of KPS 2″ (75/63) conductive piping minimised the number of welds required.
  • Installation was simple and time minimised with KPS’ compact electrofusion fittings which weld both piping walls simultaneously.
  • KPS’ conductive piping creates an electrostatically safe system, preventing potential static charge build-up.
  • KPS’ double wall piping provides an extra layer of protection. All double wall KPS bends, electrofusion fittings and tees also have permeation protection and an interstitial space.
  • KPS liaised with AXIMA, a KPS certified installer to deliver a high-quality installation.
KPS conductive pipes are electrostatically safe
KPS 2’’ (75/63) & KPS 4’’ (125/110) double wall piping provide a safe, easy-install fluid transfer solution
Melun hospital, France specified KPS double wall piping to fuel their central heating system

Author:

Picture of Oscar Garcia

Oscar Garcia

Author Bio
Share this story on
LinkedIn

Featured products:

Contact us today to discuss your project