>

Our sister companies

Search
Close this search box.

Latest News

KPS Installed at Jeddah Yacht Club, Saudi Arabia

KPS expert Paul Wilkin recently visited Al Rawaya to train their KPS installation team and support their Jeddah Yacht Club piping upgrade project. A fast installation was key due to Formula 1 racing beginning shortly on the track nearby.

Piping installed: 2” (75/63) double wall to a dispenser to fill smaller boats and 4” (125/110) double wall for the larger boats. The 4″ pipe run is approximately 90 m long and there are 2 260 m 2″ pipe runs.

Check out more KPS installations here.

Author:
Picture of Aaron McConkey

Aaron McConkey

Author Bio
Share this story on
LinkedIn