>

Our sister companies

Search
Close this search box.

Nottingham City Hospital, UK

Fibrelite covers and KPS piping provide long term retrofit solution for Nottingham City Hospital’s backup generator supply lines

Project overview

Hilton Bodill Construction contacted KPS on behalf of their client, Nottingham City Hospital, who required an easy-install, corrosion-free replacement for their previously installed steel piping which supplies the hospital’s backup diesel generator. A lightweight and strong modular covering system was also required to replace the traditional heavy concrete slabs, which protect and provide access to the newly re-routed service trench.

Hilton Bodill Construction specified Fibrelite covers and KPS piping for Nottingham City Hospital refurbishment
Fibrelite covers are corrosion-resistant, unaffected by water, underground gasses and most chemicals
Quick access to piping is vital for maintenance and inspection
Apertures were required in some covers to accommodate pipework connecting from within the trench to above ground networks

Problem

The previously existing concrete trench access covers were heavy, requiring specialist lifting equipment to remove and replace them: a time consuming and expensive process. Due to their weight, they also posed a risk of injury to maintenance teams (quick access to the piping is vital for maintenance and inspection). Nottingham City Hospital also wanted to replace their steel pipework with a reliable plastic piping system, eliminating the potential for corrosion and subsequent fluid egress.
Key issues with the previously existing products:
Concrete access covers
  • Heavy concrete access covers posed a risk of injury to maintenance teams and required specialist personnel/machinery for removal and replacement.
  • Concrete covers often fracture and chip over time.
  • Some covers would need to be modified to accommodate pipework extending from within the trench to above ground networks.
Steel pipework
  • Steel pipework can corrode over time, resulting in fluid egress (leaks).
  • The traditional steel pipework was heavy and labour intensive to work with.
As the filling points were installed inside a garage building, a leak free zero permeation system was essential

Solution

OPW’s UK technical team put together a proposal combining lightweight Fibrelite GRP composite trench covers and KPS double wall polyethylene piping, which was accepted by the contractor and end user.

Key benefits of Fibrelite covers for this project:

  • No specialist machinery or personnel required for removal and replacement.
  • Strength-to-weight ratio. All trench covers can be safely removed manually by two people while strong enough to withstand sustained loading.
  • Bespoke aluminium frame section supplied by Fibrelite to fit exiting rebate – ensuring minimal upheaval to site works.
  • Bespoke Fibrelite covers modified to include apertures accommodating pipework extending from within the trench to above ground networks.
  • Fibrelite covers are corrosion-resistant – unaffected by water, underground gasses and most chemicals.

Key benefits of KPS piping for this project:

  • Engineered for easy installation. Compact, installer friendly KPS fittings weld both walls of a double wall pipe simultaneously.
  • In house and onsite installation training provided (standard for clients new to the KPS piping system).
  • Lightweight.
  • Corrosion free polyethylene piping.
  • Zero permeation (liquid/watertight).
All trench covers can be safely removed manually by two people while strong enough to withstand sustained loading
KPS’ plastic piping provide a safe, easy-install fluid transfer solution
Fibrelite covers eliminate the need for specialist personnel or lifting machinery during maintenance or operation

Result

The easy access solution provided by Fibrelite trench covers eliminates the need for any specialist personnel or machinery during maintenance or operation, while KPS piping provides a compact, long-term fluid transfer solution (trusted by oil companies around the globe).
Fibrelite and KPS benefits at a glance:
  • Easy manual access to trench services using the ergonomically designed Fibrelite FL7 lifting handles.
  • Best access cover strength to weight ratio available in the market today.
  • Bespoke, made-to-measure.
  • A long-term solution.
  • Fast, simple piping installation.
  • Local technical support.
As the filling points were installed inside a garage building, a leak free zero permeation system was essential

Author:

Picture of Oscar Garcia

Oscar Garcia

Author Bio
Share this story on
LinkedIn

Featured products:

Contact us today to discuss your project